Our customers save an average of £34,000 on their projects *
Let us handle your Utilities Planning and Applications and see how much we can save you
Start now
Managed Commercial Electricity Temporary Disconnection Planning & Applications
Planning. To save you money
Need a Commercial Electricity Temporary Disconnection?
We help you save on new & existing quotes through our Network of Certified Providers, simplifying complex information and offering trustworthy guidance. Our goal is to save you money.
We've saved our last 10 customers a combined £343,000*. Let us handle your Commercial Electricity Temporary Disconnection and save you money.
Our Focus
We specialize in Commercial Electricity Temporary Disconnection Planning, Applications & Management, ensuring your Commercial Electricity Temporary Disconnection is handled efficiently, safely, and with minimal disruption to your business operations. Whether you’re constructing a new property, setting up a commercial unit, or future-proofing your business, our team provides the expertise you need to get disconnected with confidence.
Real Results from Past Projects
Case Study: Electricity New 3 Phase Connection 2024
Client: Electrical Engineering Contractor
Project Value: £300,000
Year: 2024
Challenge:
- High-value quotation for a new 3-phase connection
- Design costs deemed unsatisfactory
Solution:
- Conducted a thorough review of design costs
- Engaged in discussions with the supplier and customer
- Agreed an acceptable load within the local network's capacity
Outcome:
- Achieved a significant cost saving of approximately £290,000
Case Study: New Water & Electricity Connection 2024
Client: Master Builder
Project Value: N/A (Review of multiple quotes)
Year: 2024
Challenge:
- Multiple quotes from various providers for water and electricity connections
- Project required road crossings for both services
Solution:
- Identified an opportunity for collaboration on traffic management and road crossings
- Coordinated both providers to reduce the need for multiple crossings
- Minimized excessive traffic management costs
Outcome:
- Achieved a total saving of £5,366 for the customer
Case Study: New Gas Connection 2023
Client: High-Value Domestic Property Developer
Project Value: N/A (Multiple utility connections)
Year: 2023
Challenge:
- Procurement of certified contractor
- Design required both gas and foul water connections to cross at the same point
Solution:
- Identified an opportunity for collaboration on traffic management and road crossings
- Coordinated both providers to reduce the need for multiple crossings
- Minimized excessive traffic management costs
Outcome:
- Achieved a total saving of approximately £3,000 for the customer
Case Study: Phone Line Connections for High-Value Domestic Properties 2023
Client: High-Value Domestic Property Developer
Project Value: £8,000 (Initial Quote)
Year: 2023
Challenge:
- Telecoms provider initially quoted £8,000 for four new phone line connections
- Design costs were deemed unsatisfactory
Solution:
- Conducted a thorough review of design costs
- Challenged the supplier regarding the costs
- Engaged in discussions with Telecoms provider
Outcome:
- Telecoms provider agreed to deliver the work free of charge
- Achieved a total saving of £8,000 for our customer
Case Study: Foul Water Installation 2023
Client: High-Value Domestic Property Developer
Project Value: £10,000 to £15,000 (Potential Savings)
Year: 2023
Challenge:
- Initial structural engineering design included an electric pumping station and sump
- These elements were deemed potentially unnecessary
Solution:
- Procured a certified contractor for the works
- Reviewed the structural design with our subcontractor
- Determined that the system could be gravity-fed, eliminating the need for the electric pumping station and sump
Outcome:
- Achieved a potential saving of £10,000 to £15,000 for our customer
Reasons Why You May Need a Commercial Electricity Temporary Disconnection
- Building a new property over existing service route: When constructing a new building, the existing service route may need to be altered to accommodate the new structure.
- Dividing a commercial unit: If you're dividing a commercial space into multiple units, each may require its own meter and supply adjustment.
- Building an extension over existing service route: Expanding your commercial property over an existing service route may necessitate moving the meter and supply lines to ensure safe and compliant installation.
- Installing a swimming pool over existing service route: The addition of a swimming pool may require the existing service route to be relocated to avoid interference or potential hazards.
- Moving the existing supply to a safer location: Relocating the supply to a more appropriate area, such as outside a kitchen, toilet, bathroom, basement, or service area, to enhance safety and compliance.
- Wanting the meter and supply outside: Moving the meter and supply to an external meter box or kiosk for easier access and improved safety.
Why Use Us?
- Saving on Existing Quotes: We often save customers money on quotes they have already received by using our network of certified and experienced providers
- Complex Information: We remove the need for customers to understand the complex information - we understand that not everyone is a specialist in the required field of works
- Trustworthy Guidance: We help guide customers to know where to go or who to trust
- Fair Pricing: We want to stop customers being extorted for the financial gain of the contractor
- Timely Delivery: We ensure the project is delivered on time
- Correct Supply: We ensure that the supply is correct for your needs
- Budget Adherence: We ensure the project is delivered within budget
- Power Outages: We minimize power outages during project delivery
- Vulnerable Customers: We provide special care for vulnerable customers
Common Problems We Solve
- Incorrect design: Ensuring the disconnection design meets all necessary safety and operational requirements.
- Increased costs: Avoiding unexpected costs by ensuring all elements of the project are considered during the quote and design stage, preventing budget overruns.
- Expensive traffic management, TTRO's/Road closures: Managing any necessary road closures or traffic management issues efficiently to avoid unnecessary costs and delays.
- Locating a safe place to disconnect supply: Identifying the safest and most efficient point for disconnection, avoiding potential hazards.
- Under-spec design: Ensuring the disconnection plan fully meets your requirements, avoiding the need for costly adjustments or extensions later on.
- Wayleaves and easements: Navigating the complex legal landscape of land ownership to ensure that all necessary permissions are obtained, avoiding delays or legal disputes.
- Civils in the public/private domains: Ensuring that all civil engineering works are carried out with the correct licensing and certification, avoiding potential legal and safety issues.
- Bad customer journey: Improving the overall experience by ensuring transparency, clear communication, and efficient management of your project.
- Poor communication: Addressing communication issues by keeping you informed at every stage of the process, ensuring you know what’s happening and when.
- Customer left in the dark: Ensuring you are not left wondering about the status of your project by providing regular updates and clear timelines.
- Third-party land ownership: Securing the necessary permissions to carry out works on land owned by third parties, avoiding delays and legal complications.
* All business segments, August 2024