Our customers save an average of £34,000 on their projects *
Let us handle your Utilities Planning and Applications and see how much we can save you
Start now
Managed Commercial Gas Service Alteration Planning & Applications
Planning. To save you money
Need a Commercial Gas Service Alteration?
We help you save money on new & existing quotes through our Network of Certified Providers, simplifying complex information and offering trustworthy guidance. Our goal is to save you money.
We've saved our last 10 customers a combined £343,000*. Let us handle your Commercial Gas Service Alteration and save you money.
Our Focus
Our commitment ensures fair pricing, timely project delivery, and adherence to your budget. We also provide special care for vulnerable customers and work to minimize gas outages throughout the project.
How we work...
- You submit any existing plans and requirements (and quotes if you have any)
- We analyze and find cost-saving opportunities
- You receive a FREE report showing any potential savings or a fair cost estimate
- One of our expert team will speak with you to discuss moving forward to project delivery
Get A Free Quote
See Real Results
We specialize in Gas Service Alteration Planning, Applications & Management, ensuring your gas service alteration is handled smoothly, efficiently, and with minimal disruption. Whether you're building a new property, adding an extension, or simply relocating your meter for safety reasons, our team provides the expertise you need.
Real Results from Past Projects
Case Study: Electricity New 3 Phase Connection 2024
Client: Electrical Engineering Contractor
Project Value: £300,000
Year: 2024
Challenge:
- High-value quotation for a new 3-phase connection
- Design costs deemed unsatisfactory
Solution:
- Conducted a thorough review of design costs
- Engaged in discussions with the supplier and customer
- Agreed an acceptable load within the local network's capacity
Outcome:
- Achieved a significant cost saving of approximately £290,000
Case Study: New Water & Electricity Connection 2024
Client: Master Builder
Project Value: N/A (Review of multiple quotes)
Year: 2024
Challenge:
- Multiple quotes from various providers for water and electricity connections
- Project required road crossings for both services
Solution:
- Identified an opportunity for collaboration on traffic management and road crossings
- Coordinated both providers to reduce the need for multiple crossings
- Minimized excessive traffic management costs
Outcome:
- Achieved a total saving of £5,366 for the customer
Case Study: New Gas Connection 2023
Client: High-Value Domestic Property Developer
Project Value: N/A (Multiple utility connections)
Year: 2023
Challenge:
- Procurement of certified contractor
- Design required both gas and foul water connections to cross at the same point
Solution:
- Identified an opportunity for collaboration on traffic management and road crossings
- Coordinated both providers to reduce the need for multiple crossings
- Minimized excessive traffic management costs
Outcome:
- Achieved a total saving of approximately £3,000 for the customer
Case Study: Phone Line Connections for High-Value Domestic Properties 2023
Client: High-Value Domestic Property Developer
Project Value: £8,000 (Initial Quote)
Year: 2023
Challenge:
- Telecoms provider initially quoted £8,000 for four new phone line connections
- Design costs were deemed unsatisfactory
Solution:
- Conducted a thorough review of design costs
- Challenged the supplier regarding the costs
- Engaged in discussions with Telecoms provider
Outcome:
- Telecoms provider agreed to deliver the work free of charge
- Achieved a total saving of £8,000 for our customer
Case Study: Foul Water Installation 2023
Client: High-Value Domestic Property Developer
Project Value: £10,000 to £15,000 (Potential Savings)
Year: 2023
Challenge:
- Initial structural engineering design included an electric pumping station and sump
- These elements were deemed potentially unnecessary
Solution:
- Procured a certified contractor for the works
- Reviewed the structural design with our subcontractor
- Determined that the system could be gravity-fed, eliminating the need for the electric pumping station and sump
Outcome:
- Achieved a potential saving of £10,000 to £15,000 for our customer
Reasons Why You May Need a Gas Service Alteration
- Building a new property over existing service route: New construction often requires altering the existing gas service route to accommodate the new structure safely and efficiently.
- Building an annex: Adding an annex to your property may require relocating the gas meter to ensure it remains accessible and compliant with safety regulations.
- Building an extension over existing service route: Expanding your property over an existing service route often necessitates moving the gas meter and supply lines to prevent interference and maintain safety.
- Installing a swimming pool over existing service route: The addition of a swimming pool may require relocating the gas service route to avoid potential hazards and ensure compliance with regulations.
- Moving the existing supply to a safer location: Relocating the gas supply from potentially dangerous areas such as kitchens, toilets, bathrooms, or basements to a safer location.
- Wanting the meter and supply outside: Moving the gas meter and supply to an external meter box for easier access and enhanced safety.
Why Use Us?
- Saving on Existing Quotes: We often save customers money on quotes they have already received by using our network of certified and experienced providers
- Complex Information: We remove the need for customers to understand the complex information - we understand that not everyone is a specialist in the required field of works
- Trustworthy Guidance: We help guide customers to know where to go or who to trust
- Fair Pricing: We want to stop customers being extorted for the financial gain of the contractor
- Timely Delivery: We ensure the project is delivered on time
- Budget Adherence: We ensure the project is delivered within budget
- Vulnerable Customers: We provide special care for vulnerable customers
- Gas Outages: Minimizing gas outages during the project delivery or in general to their property/area
Common Problems We Solve
- Incorrect design: Ensuring the design meets all necessary safety and operational requirements for the gas service alteration.
- Increased costs: Avoiding unexpected costs by ensuring all elements of the project are considered during the quote and design stage, preventing budget overruns.
- Expensive traffic management, TTRO's/Road closures: Managing any necessary road closures or traffic management issues efficiently to avoid unnecessary costs and delays.
- Over-spec and costly design: Preventing designs that exceed your actual needs, saving you money by avoiding unnecessary specifications and equipment.
- Under-spec design: Ensuring the design fully meets your requirements, avoiding the need for costly adjustments or upgrades later on.
- Wayleaves and easements: Navigating the complex legal landscape of land ownership to ensure that all necessary permissions are obtained, avoiding delays or legal disputes.
- Civils in the public/private domains: Ensuring that all civil engineering works are carried out with the correct licensing and certification, avoiding potential legal and safety issues.
- Bad customer journey: Improving the overall experience by ensuring transparency, clear communication, and efficient management of your project.
- Poor communication: Addressing communication issues by keeping you informed at every stage of the process, ensuring you know what’s happening and when.
- Customer left in the dark: Ensuring you are not left wondering about the status of your project by providing regular updates and clear timelines.
* All business segments, August 2024