Multi-Utility Projects New Multi-Utility Connection Multi-Utility Disconnection Multi-Utility Meter Move Multi-Utility Service Alteration Multi-Utility Supply Increase Multi-Utility Temporary Disconnection Helpful Information Gas, Electricity and Water Multi-Utility Projects covers all combinations of Utilities.
Gas New Gas Connection Gas Disconnection Gas Meter Move Gas Service Alteration Gas Supply Increase Temporary Gas Disconnection Helpful Information Domestic Gas Supplies U6 is a diaphragm meter that is the most common domestic meter. U6 refers to the capacity of the meter, which is 6 cubic metres per hour. It's a low-pressure meter that has a flow rate of 0 – 65 kW. Commercial Gas Supplies Small businesses can have requirements similar to domestic customers. Commercial buildings, on the other hand, typically use much more gas. Medium-sized businesses often use between 70 kW and 150 kW, and the biggest ones 1000 kW or even more.
Water New Water Connection Water Disconnection Water Meter Move Water Service Alteration Water Supply Increase Temporary Water Disconnection Helpful Information Domestic Water Supplies In the UK 25mm MDPE is the standard size of new water supply pipe for a domestic property, and if less than 40m of continuous below ground water supply pipe is needed, however check with local water authority requirements for your project as certain areas may differ. 12.5 bar maximum operating pressure.
Domestic Electricity New Electricity Connection Electricity Disconnection Electricity Meter Move Electricity Service Alteration Electricity Supply Increase Temporary Electricity Disconnection EV Charging Point Helpful Information Domestic Electricity This section is for single phase 100A services with a max supply of 23kVA and up to 4 Plots and or a 69kVA 100A 3 phase service without a mains extension.
Commercial Utilities Electricity (Commercial) Gas (Commercial) Water (Commercial) Multi-Utility (Commercial) Helpful Information Commercial Electricity Supply demand from 69kVA 100A 3 phase service. For example: 200A, 400A, 600A and above.
About What We Do About Us Contact us Helpful Information Integrity Network Consultants Ltd Registered in England No. 15225206.
About your Domestic EV Charging Point Planning. To save you money 1/3 Your Project Please tell us a little about your project requirements... Where is your meter located? Internal External Unsure What type of service do you have? Single-Phase 3-Phase Unsure What is your total kVA required 0-23kVA 0-69kVA 0-125kVA 125kVA+ Unsure Is your use Domestic or Commercial? Domestic Commercial Unsure Have you had any quotes for this project yet? Yes No What was the total for the quotation? (We forensically examine quotations and design documents to reduce costs) 2/3 Site Contact Who is the contact for the work site? Address line 1 Postcode Postcode found. Click here to select. We use What3Words to identify the specific point of your job. Please select as close as possible to the precise location on your site. Use this point Help us with a specific location Contact title Mr Mrs Miss Ms Dr Rev Contact first name Contact last name Email Phone 3/3 Your contact details And finally, tell us about you (You can copy from the contact details you entered if you are the site contact). Copy from Site details Your title Mr Mrs Miss Ms Dr Rev Your first name Your last name Address line 1 Postcode Email Phone
Need Help? We are here to help. If you are unsure of any of the answers, please feel free to reach out to us by telephone or email. Utilities can be complex projects that without proper planning regularly run over schedule and incur increasing costs. Call us on 0303 040 1213 or Contact Us