Our customers save an average of £34,000 on their projects *
Let us handle your Utilities Planning and Applications and see how much we can save you
Start now
Managed Water Planning & Applications
Planning. To save you money
Mains Water Supply Planning, Applications & Management
Whether you need a new Mains Water connection, a Mains Water Disconnection, a Mains Water Supply Increase, or a Mains Water Meter moved, we can Save You Time & Money
What Do You Need?
- New Water Supply
- Disconnect Water Supply
- Increase Water Supply
- Move Water Meter
- Water Service Alteration
How we work...
- You submit any existing plans and requirements (and quotes if you have any)
- We analyze and find cost-saving opportunities
- You receive a FREE report showing any potential savings or a fair cost estimate
- Pay a fixed cost for us to Manage your required Utilities Applications
Need Help On A Water Project?
Get In Touch
To speak with a Utilities Planning expert, call us on 0303 040 1213 Mon-Fri 09:00-17:00
We believe in saving you money while creating a relaxing customer journey.
Business With Integrity
Or Let Us Call You
One of our Utilities Planning experts will call you (Mon-Fri 09:00-17:00)
Your number will be used solely to contact you about this enquiry.
Real Results from Past Projects
Case Study: Electricity New 3 Phase Connection 2024
Client: Electrical Engineering Contractor
Project Value: £300,000
Year: 2024
Challenge:
- High-value quotation for a new 3-phase connection
- Design costs deemed unsatisfactory
Solution:
- Conducted a thorough review of design costs
- Engaged in discussions with the supplier and customer
- Agreed an acceptable load within the local network's capacity
Outcome:
- Achieved a significant cost saving of approximately £290,000
Case Study: New Water & Electricity Connection 2024
Client: Master Builder
Project Value: N/A (Review of multiple quotes)
Year: 2024
Challenge:
- Multiple quotes from various providers for water and electricity connections
- Project required road crossings for both services
Solution:
- Identified an opportunity for collaboration on traffic management and road crossings
- Coordinated both providers to reduce the need for multiple crossings
- Minimized excessive traffic management costs
Outcome:
- Achieved a total saving of £5,366 for the customer
Case Study: New Gas Connection 2023
Client: High-Value Domestic Property Developer
Project Value: N/A (Multiple utility connections)
Year: 2023
Challenge:
- Procurement of certified contractor
- Design required both gas and foul water connections to cross at the same point
Solution:
- Identified an opportunity for collaboration on traffic management and road crossings
- Coordinated both providers to reduce the need for multiple crossings
- Minimized excessive traffic management costs
Outcome:
- Achieved a total saving of approximately £3,000 for the customer
Case Study: Phone Line Connections for High-Value Domestic Properties 2023
Client: High-Value Domestic Property Developer
Project Value: £8,000 (Initial Quote)
Year: 2023
Challenge:
- Telecoms provider initially quoted £8,000 for four new phone line connections
- Design costs were deemed unsatisfactory
Solution:
- Conducted a thorough review of design costs
- Challenged the supplier regarding the costs
- Engaged in discussions with Telecoms provider
Outcome:
- Telecoms provider agreed to deliver the work free of charge
- Achieved a total saving of £8,000 for our customer
Case Study: Foul Water Installation 2023
Client: High-Value Domestic Property Developer
Project Value: £10,000 to £15,000 (Potential Savings)
Year: 2023
Challenge:
- Initial structural engineering design included an electric pumping station and sump
- These elements were deemed potentially unnecessary
Solution:
- Procured a certified contractor for the works
- Reviewed the structural design with our subcontractor
- Determined that the system could be gravity-fed, eliminating the need for the electric pumping station and sump
Outcome:
- Achieved a potential saving of £10,000 to £15,000 for our customer
In the UK 25mm MDPE is the standard size of new water supply pipe for a domestic property, and if less than 40m of continuous below ground water supply pipe is needed, however check with local water authority requirements for your project as certain areas may differ. 12.5 bar maximum operating pressure.
Don't worry, let us take care of the technical details so you don't need to worry about the industry jargon.