Our customers save an average of £34,000 on their projects *
Let us handle your Utilities Planning and Applications and see how much we can save you
Start now
Managed Commercial Utilities Planning & Applications
Planning. To save you money
Experts In Planning & Management
Let our industry experts analyze your requirements to deliver a bespoke design that meets your supply needs.
Forensic Cost Examination
We carefully scrutinize all costs related to project delivery, ensuring they are accurately priced and essential for the project, rather than simply passing them on to our customers.
We are experts in both Contestable & Non-Contestable work, with in-depth knowledge of what a Distribution Network Operator (DNO) can and cannot do..
What Do You Need?
New Connection
✓ Any New Utilities Connections to Site
✓ Temporary Supplies
✓ Temporary Builder's Supply
✓ Traffic Management
✓ New Meter Cabinet
Disconnection
✓ Any Utilities Disconnections
✓ Removal of Meters
Meter Move
✓ Any Meter Moves or Relocations
✓ Moving Meters to Outside Wall
Service Alteration
✓ Any Utility Service Alteration
✓ Relocation of Supply
✓ Diverting a Service
Supply Increase
✓ Increase of Any Utility Supply to Site
✓ Domestic to Commercial Supply
✓ Substation Installation
✓ Network Reinforcement
Need Help On A Commercial Utilities Project?
Get In Touch
To speak with a Utilities Planning expert, call us on 0303 040 1213 Mon-Fri 09:00-17:00
We believe in saving you money while creating a relaxing customer journey.
Business With Integrity
Or Let Us Call You
One of our Utilities Planning experts will call you (Mon-Fri 09:00-17:00)
Your number will be used solely to contact you about this enquiry.
How we work...
- You submit any existing plans and requirements (and quotes if you have any)
- We analyze and find cost-saving opportunities
- You receive a FREE report showing any potential savings or a fair cost estimate
- One of our expert team will speak with you to discuss moving forward to project delivery
Real Results from Past Projects
Case Study: Electricity New 3 Phase Connection 2024
Client: Electrical Engineering Contractor
Project Value: £300,000
Year: 2024
Challenge:
- High-value quotation for a new 3-phase connection
- Design costs deemed unsatisfactory
Solution:
- Conducted a thorough review of design costs
- Engaged in discussions with the supplier and customer
- Agreed an acceptable load within the local network's capacity
Outcome:
- Achieved a significant cost saving of approximately £290,000
Case Study: New Water & Electricity Connection 2024
Client: Master Builder
Project Value: N/A (Review of multiple quotes)
Year: 2024
Challenge:
- Multiple quotes from various providers for water and electricity connections
- Project required road crossings for both services
Solution:
- Identified an opportunity for collaboration on traffic management and road crossings
- Coordinated both providers to reduce the need for multiple crossings
- Minimized excessive traffic management costs
Outcome:
- Achieved a total saving of £5,366 for the customer
Case Study: New Gas Connection 2023
Client: High-Value Domestic Property Developer
Project Value: N/A (Multiple utility connections)
Year: 2023
Challenge:
- Procurement of certified contractor
- Design required both gas and foul water connections to cross at the same point
Solution:
- Identified an opportunity for collaboration on traffic management and road crossings
- Coordinated both providers to reduce the need for multiple crossings
- Minimized excessive traffic management costs
Outcome:
- Achieved a total saving of approximately £3,000 for the customer
Case Study: Phone Line Connections for High-Value Domestic Properties 2023
Client: High-Value Domestic Property Developer
Project Value: £8,000 (Initial Quote)
Year: 2023
Challenge:
- Telecoms provider initially quoted £8,000 for four new phone line connections
- Design costs were deemed unsatisfactory
Solution:
- Conducted a thorough review of design costs
- Challenged the supplier regarding the costs
- Engaged in discussions with Telecoms provider
Outcome:
- Telecoms provider agreed to deliver the work free of charge
- Achieved a total saving of £8,000 for our customer
Case Study: Foul Water Installation 2023
Client: High-Value Domestic Property Developer
Project Value: £10,000 to £15,000 (Potential Savings)
Year: 2023
Challenge:
- Initial structural engineering design included an electric pumping station and sump
- These elements were deemed potentially unnecessary
Solution:
- Procured a certified contractor for the works
- Reviewed the structural design with our subcontractor
- Determined that the system could be gravity-fed, eliminating the need for the electric pumping station and sump
Outcome:
- Achieved a potential saving of £10,000 to £15,000 for our customer
Commercial Electricity supplies are generally from 69kVA 100A 3 phase service. For example: 200A, 400A, 600A and above.
Don't worry, let us take care of the technical details so you don't need to worry about the industry jargon.